The introduction model of productive norms in building

Authors

  • O. L. Herasymova PSACEA, Dnipropetrovsk, Ukraine

DOI:

https://doi.org/10.15802/stp2011/9458

Keywords:

economic efficiency, constant and variable expenses, estimate cost

Abstract

In the article the issues of setting norms for levels of economic efficiency depending on ratios of variables (prime price, constant and variable costs, estimate cost of works performed) for providing a control of cost and dates of realization of build projects.

Author Biography

O. L. Herasymova, PSACEA, Dnipropetrovsk

O. Л. Герасимова 

Published

2011-06-25

How to Cite

Herasymova, O. L. (2011). The introduction model of productive norms in building. Science and Transport Progress, (37), 151–154. https://doi.org/10.15802/stp2011/9458