Building operation of magnito-levitate train as a part of multivariable system

Authors

  • V. A. Poliakov Dnipropetrovsk, Institute of transport systems and technologies NAS of Ukraine, Ukraine
  • N. M. Khachapurydze Dnipropetrovsk, Institute of transport systems and technologies NAS of Ukraine, Ukraine

DOI:

https://doi.org/10.15802/stp2011/8705

Keywords:

dynamics of magnetic levitated train, process of agreed motion synthesis, single-channel design, stabilization of deviations

Abstract

The technique of construction of dynamics of magnetic levitated train in view of multiconnectivity of its design scheme is offered. The conrtolled components of a system’s state vector are divided into ones that suppose an independent controlling them and others that demand the intragroup coordination. The offered technique has been evidently geometrically interpreted. A process of agreed motion synthesis has been divided into subtasks of singlechannel design of an aggregated motion and stabilization of deviations.

Author Biographies

V. A. Poliakov, Dnipropetrovsk, Institute of transport systems and technologies NAS of Ukraine

В. А. Поляков

N. M. Khachapurydze, Dnipropetrovsk, Institute of transport systems and technologies NAS of Ukraine

Н. М. Хачапуридзе

Published

2011-03-25

How to Cite

Poliakov, V. A., & Khachapurydze, N. M. (2011). Building operation of magnito-levitate train as a part of multivariable system. Science and Transport Progress, (36), 29–33. https://doi.org/10.15802/stp2011/8705

Issue

Section

ROLLING STOCK AND TRAIN TRACTION