Buildings' characteristics of magnet-levitated train operation
DOI:
https://doi.org/10.15802/stp2011/6801Keywords:
magnetic levitated train, construction of motion, unpredictable conditions of motionAbstract
Factors, which complicate the situation of magnetic levitated train motion, are revealed and described. Influence of these complications on motion problems of a train is noted. The impossibility of parrying of the described collision without a radical rising of dynamic resources of a train is stated. It is shown that the achievement of controllability of the system is possible only if the overcoming of surplus degrees of its freedoms is achieved. The rational way of such an overcoming is shown. The technique of construction of the train motion in unpredictable conditions, which considers features of such a construction, is developed.
Downloads
Published
How to Cite
Issue
Section
License
Copyright and Licensing
This journal provides open access to all of its content.
As such, copyright for articles published in this journal is retained by the authors, under the terms of the Creative Commons Attribution 4.0 International License (CC BY 4.0). The CC BY license permits commercial and non-commercial reuse. Such access is associated with increased readership and increased citation of an author's work. For more information on this approach, see the Public Knowledge Project, the Directory of Open Access Journals, or the Budapest Open Access Initiative.
The CC BY 4.0 license allows users to copy, distribute and adapt the work in any way, provided that they properly point to the author. Therefore, the editorial board of the journal does not prevent from placing published materials in third-party repositories. In order to protect manuscripts from misappropriation by unscrupulous authors, reference should be made to the original version of the work.