Analysis of the Influence of the Relative Position of Retarders and Bypass Tracks on the Length of the Neck of the Sorting Slide and Their Automated Design
DOI:
https://doi.org/10.15802/stp2025/341695Keywords:
sorting hump, wagon decelerator, bypass track, gauge distance, automated designAbstract
Purpose. The purpose of this study is to find ways to reduce the length of sorting yard humps by analyzing the relative positioning of the decelerators on the descent section and other elements of the track layout of the humps, such as turnouts, their isolated pre-switch sections, curved track sections and adjacent tracks, including bypass tracks. Methodology. One of the approaches to reducing energy consumption during the breaking up and formation of trains on classification humps is the improvement of their track layout design, in particular the development and implementation of measures to reduce the length of hump throats. To solve the problem, a comprehensive analysis of the technology of dissolving trains on sorting humps was used, methods of scientific analysis and synthesis of track development design based on analytical geometry were applied, as well as simulation modelling methods to determine the mutual position of the decelerators of the descent section and adjacent bypass tracks. Findings. Based on an analysis of the lower clearance limits for structures (profile «C») and the dimensional characteristics of beam-type pneumatic wagon retarders, technical solutions were developed to allow a track from the outer group of classification tracks to approach the retarder pit area bypassing the hump body. The calculation of the parameters for connecting a bypass track from the group of classification tracks showed that the straight section of track behind the braking position can be reduced on average by 5.65 meters, depending on the type of lower retarder installed at the given braking point. Originality. The work improves the methods for designing the descent section of sorting humps and bypass tracks; for the first time, it establishes the dependence of the reduction in the length of the switch throat of the end track bundle of the sorting yard on the types of retarders with which the braking position is equipped. Practical value. The practical value of the study lies in the potential application of the obtained solutions by design engineers during reconstruction works on existing classification humps and in the design of new hump classification facilities on mainline railways and industrial railway systems.
References
Berezovyi, M., Bozhko, M., Malashkin, V., Bolvanovska, T., & Mazurenko, O. (2025). Analysis of the Construction of Bypass Tracks in Sorting Parks and Their Automated Design. Transport Systems and Transportation Technologies, 29, 5–13. DOI: https://doi.org/10.15802/tstt2025/325346 (in Ukrainian)
Buzanov, S. P., Karpov, A. M., & Ryitsarev, M. A. (1965). Proektirovanie mehanizirovannyih i avtomatizirovannyih sortirovochnyih ustroystv. Moskva: Transport. (in Russian)
Habaryty nablyzhennia budivel i rukhomoho skladu zaliznyts kolii 1520 (1524) mm, 50DSTU B V.2.3-29:2011 (2012). (in Ukrainian)
Dnipropetrovskyi natsionalnyi universytet zaliznychnoho transportu (2012). Instruktsiia z ulashtuvannia ta utrymannia kolii zaliznyts Ukrainy: TsP-0269. Kyiv: Transport Ukrainy. (in Ukrainian)
Kozachenko, D. M., Bozhko, M. Р., Berezovyj, M. I. & Malashkin, V. V. (2023). Avtomatyzacija rozrakhunku polozhennja ghranychnogho stovpchyka mizh sumizhnymy kolijamy riznoji konstrukciji. Transportni systemy i tekhnologhiji perevezenj, 25, 84-91. DOI: https://doi.org/10.15802/tstt2023/284497 (in Ukrainian)
Kozachenko, D. M., Bozhko, M. Р., Berezovyj, M. I. & Malashkin, V. V. (2022). Analiz isnujuchykh metodiv rozrakhunku polozhennja ghranychnykh stovpchykiv. Transportni systemy i tekhnologhiji perevezenj, 24, 75-80. DOI: https://doi.org/10.15802/tstt2022/272303 (in Ukrainian)
Ministerstvo putey soobscheniya SSSR. (1992). Pravila i normyi proektirovaniya sortirovochnyih ustroystv na zheleznyih dorogah Soyuza SSR: VSN 207-89. Moskva: Transport. (in Russian)
Roghynskyj, N. O., Rodymov, B. A., & Zubrylyn, Gh. Y. (1949). Mekhanyzacyja sortyrovochnykh ghorok. Moskva: Transzheldoryzdat. (in Russian)
Ukrainskyi derzhavnyi universytet zaliznychnoho transportu. (2018). Sporudy transportu. Zaliznytsi kolii 1520 mm. Normy proektuvannia: DBN V.2.3-19:2018. Kyiv: Minrehion Ukrainy. (in Ukrainian)
Derzhavne pidpryiemstvo Naukovo-doslidnyi ta proektno-vyshukuvalnyi instytut transportnoho budivnytstva «Kyivdiprotrans». (2012). Sporudy transportu. Sortuvalni prystroi zaliznyts. Normy proektuvannia: HBN V.2.3-37472062-1:2012. Kyiv: Ministerstvo infrastruktury Ukrainy. (in Ukrainian)
Sushkov, V. F., Shramenko, V. P., Bjelorusov, O .I. & Voznenko, A. D. (2010). Tekhnologhija remontu j utrymannja koliji. Kharkiv: UkrSАRT. (in Ukrainian)
Umanov, M. I., Hnatenko, V. P., Moiseienko, K. V., Patlasov, O. M. & Babenko, V. K. (2000). Zbirnyk typovykh tekhnologhichnykh procesiv kapitaljnogho ta serednjogho remontiv zaliznychnoji koliji: TsP-2-1198. Dnipropetrovsjk: DIIT, Art-Pres. (in Ukrainian)
Fischer, S. (2022). Investigation of the Horizontal Track Geometry regarding Geogrid Reinforcement under Ballast. Acta Polytechnica Hungarica, 19(3), 89-101. DOI: https://doi.org/10.12700/APH.19.3.2022.3.8 (in English)
Fischer, S. (2022). Geogrid reinforcement of ballasted railway superstructure for stabilization of the railway track geometry – A case study. Geotextiles and Geomembranes, 50(5), 1036-1051.DOI: https://doi.org/10.1016/j.geotexmem.2022.05.005 (in English)
Kou, L., Sysyn, M., Fischer, S., Liu, J., & Nabochenko, O. (2022). Optical Rail Surface Crack Detection Method Based on Semantic Segmentation Replacement for Magnetic Particle Inspection. Sensors, 22(21), 8214. DOI: https://doi.org/10.3390/s22218214 (in English)
Kozachenko, D., Bobrovskyi, V., & Demchenko, Y. (2018). A method for optimization of time intervals between rolling cuts on sorting humps. Journal of Modern Transportation, 26, no. 3. 189-199.DOI: https://doi.org/10.1007/s40534-018-0161-2 (in English)
Szalai, S., Szívós, B. F., Kurhan, D., Németh, A., Sysyn, M., & Fischer, S. (2023). Optimization of Surface Preparation and Painting Processes for Railway and Automotive Steel Sheets. Infrastructures, 8(2), 28. DOI: https://doi.org/10.3390/infrastructures8020028 (in English)
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Science and Transport Progress

This work is licensed under a Creative Commons Attribution 4.0 International License.
Copyright and Licensing
This journal provides open access to all of its content.
As such, copyright for articles published in this journal is retained by the authors, under the terms of the Creative Commons Attribution 4.0 International License (CC BY 4.0). The CC BY license permits commercial and non-commercial reuse. Such access is associated with increased readership and increased citation of an author's work. For more information on this approach, see the Public Knowledge Project, the Directory of Open Access Journals, or the Budapest Open Access Initiative.
The CC BY 4.0 license allows users to copy, distribute and adapt the work in any way, provided that they properly point to the author. Therefore, the editorial board of the journal does not prevent from placing published materials in third-party repositories. In order to protect manuscripts from misappropriation by unscrupulous authors, reference should be made to the original version of the work.