Reduction of Railway Disorders Intensity Due to Improvement of Line Plan Parameters During Pasportization of Curves

Authors

DOI:

https://doi.org/10.15802/stp2021/257933

Keywords:

high-speed train traffic, methods of shooting curves, curve parameters, measurement errors, permissible train speed, driving smoothness, ride comfort

Abstract

Purpose. The work is aimed to reduce the intensity of the track disorder by improving the line plan parameters, ultimately ensuring the safety, smoothness and comfort of driving in the directions of high-speed train traffic. Methodology. To obtain initial data on the parameters of the plan of existing railways, the authors reviewed the world literature on the topic of the study, as well as monitored the railway track operation on the basis of technical passports of track distances. It is known that the accepted mathematical models of the existing plan use the assumption that three adjacent points of the curve lie on a circle. On this principle, the work of flattener machine for switches is based. As a result of corrective works to reduce the amount of shifts, the curve does not correspond to the initial passport data. The methodology involves the analysis and systematization of data to establish appropriate dependencies and build graphs. Findings. Inaccurate determination of the curve parameters results in unjustified speed restrictions on or large volumes of flattening works. Therefore, the proposals have been developed to reduce the intensity of track disorders by bringing the curve parameters to the regulatory requirements in force in Ukraine in the areas of high-speed train traffic. They follow from the analysis of the method of shooting curves used in track distances. The influence of accuracy of the obtained data on the establishment of the curve parameters and the permissible train speeds is identified. The recommendations received in the work will contribute to the effectiveness of design decisions, will determine the quality of the railway reconstruction project. Originality. Scientific approaches to estimating the state of curves, determining their rational parameters and permissible speed in the areas of high-speed train traffic in Ukraine have been further developed. Practical value. The obtained results will be useful for measures to improve the smoothness of train movement, increasing the speed and comfort of driving in the curved track sections, especially in the areas of high-speed train traffic.

References

Babenko, A. I., Kurhan, D. M., & Cherniakov, M. M. (2012). Vstanovlennia dopustymoi shvydkosti na skladnykh diliankakh planu zaliznytsi z urakhuvanniam komfortabelnosti yizdy. Transport Systems and Technologies, 21, 9-15. (in Ukrainian)

Baidak, S. Yu. (2020). Rational Curves Parameters for the Introduction of High-Speed Train Traffic (Extended abstract of PhD dissertation). Dnipro. (in Ukrainian)

Danylenko, E. I., Orlovskyi, A. M., Kurhan, M. B., & Yakovliev, V. O. (2012). Instruktsiia z ulashtuvannia ta utrymannia kolii zaliznyts Ukrainy: СP-0269. Kyiv: TOV «NVP Polihrafservis». (in Ukrainian)

Korzhenevych, I. P. (2007). New possibilities for designing plan redevelopment and correction of curves when using the program RWPlan 1.2. Railway transport of Ukraine, 5, 79-82. (in Ukrainian)

Kurhan, M. B., Kurhan, D. M., Baidak, S. Yu., & Khmelevska, N. P. (2017). Investigation of the influence of the state of the railway track in terms of softness and safety of trains. Electromagnetic Compatibility and Safety on Railway Transport, 14, 94-101. DOI: https://doi.org/10.15802/ecsrt2017/137797 (in Ukrainian)

Kurhan, M. B., & Kurhan, D. M. (2016). Teoretychni osnovy vprovadzhennia vysokoshvydkisnoho rukhu poizdiv v Ukraini: monohrafiia. Dnipro. (in Ukrainian)

Kurhan, M. B., Baidak, S. Yu., & Khmelevska, N. P. (2014). Methodology of determination of admissible speeds of train movement on difficult sections of railroad plan. Science and Transport Progress, 2(50), 83-94. DOI: https://doi.org/10.15802/stp2014/23760 (in Ukrainian)

Kurhan, M. B., Kurhan, D. M., Baidak, S. Yu., & Khmelevska, N. P. (2018). Research of railway track parame-ters in the plan based on the different methods of survey. Science and Transport Progress, 2(74), 77-86. DOI: https://doi.org/10.15802/stp2018/129585 (in Ukrainian)

Polozhennia pro provedennia planovo-zapobizhnykh remontno-koliinykh robit na zaliznytsiakh Ukrainy, TsP-0287 (2015). (in Ukrainian)

Pravyla vyznachennja pidvyshhennja zovnishnjoji rejky i vstanovlennja dopustymykh shvydkostej v kryv-ykhdiljankakh koliji, 52 TsP-0236 (2011). (in Ukranian)

Fischer, S. (2009). Comparison of railway track transition curves. Pollack Periodica, 4(3), 99-110. DOI: https://doi.org/10.1556/pollack.4.2009.3.9 (in English)

Fischer, S. (2022). Investigation of the Horizontal Track Geometry regarding Geogrid Reinforcement under Bal-last. Acta Polytechnica Hungarica, 19(3), 89-101. DOI: https://doi.org/10.12700/APH.19.3.2022.3.8 (in English)

Jamka, M., Lisowski, S., & Strach, M. (2009). Application of modern geodesic technologies in determining the track geometry in the aspect of permissible train speeds. In Zeszyty Naukowo-Techniczne Stowarzyszenia Inżynierów i Techników Komunikacji Rzeczpospolitej Polskiej Oddział w Krakowie, seria: Materiały Konferencyjne (Nr 91, z. 149. s. 567-581). Zakopane, Poland. (in Polish)

Koc, W. (2021). Analysis of the Effectiveness of Determining the Horizontal Curvature of a Track Axis Using a Moving Chord. Problemy Kolejnictwa – Railway Reports, 65(190), 77-86. DOI: https://doi.org/10.36137/1902e (in English)

Koc, W. (2020). The method of determining horizontal curvature in geometrical layouts of railway track with the use of moving chord. Archives of Civil Engineering, 66(4), 579-591. (in English)

Koc, W. (2019). New transition curve adapted to railway operational requirements. Journal of Surveying Engi-neering, 145(3), 04019009-1-04019009-11. DOI: https://doi.org/10.1061/(asce)su.1943-5428.0000284 (in English)

Kurhan, D., & Havrylov, M. (2020). Mathematical Support of Machine Surfacing for the Railway Track. Acta Technica Jaurinensis,13(30), 246-267. DOI: https://doi.org/10.14513/actatechjaur.v13.n3.556 (in English)

Lebid, I., Kravchenya, I., Dubrovskaya, T., Luzhanska, N., Berezovyi, M., & Demchenko, Y. (2019). Identifica-tion of the railway reconstruction parameters at imposition of high speed traffic on the existing lines. In MATEC Web of Conferences (Vol. 294, pp. 1-7). DOI: https://doi.org/10.1051/matecconf/201929405003 (in English)

Pshinko, O., Kurhan, M., & Patlasov, O. (2019). Osnovnyie napravleniya razvitiya transportnoy infrastrukturyi pri vnedrenii skorostnogo dvizheniya na zheleznyih dorogah Ukrainyi. In Proceedings of the V Georgian-Polish International Scientific-Technical Conference «Transport Bridge Europe-Asia» (pp. 85-90). Kutaisi, Georgia. (in Russian)

Sasidharan, M., Burrow, M., Ghataora, G., & Marathu, R. (2022). A risk-informed decision support tool for the strategic asset management of railway track infrastructure. In Proceedings of the Institution of Mechani-cal Engineers, Part F: Journal of Rail and Rapid Transit (Vol. 236, Iss. 2, pp. 183-187). DOI: https://doi.org/10.1177/09544097211038373 (in English)

Shvets, A. O., Bolotov, O. V., Percevoj, A. K., Ghlukhov, V. V., Bolotov, O. O., & Saparova, L. S. (2020). Research of dynamic indicators and influence of different types of rolling stock on railway track. In IOP Conference Series: Materials Science and Engineering (Vol. 985, Iss. 1, pp. 1-10). DOI: https://doi.org/10.1088/1757-899x/985/1/012010 (in English)

Published

2021-12-20

How to Cite

Kurhan, M. B., Kurhan, D. M., Baidak, S. Y., Khmelevska, N. P., & Novik, R. B. (2021). Reduction of Railway Disorders Intensity Due to Improvement of Line Plan Parameters During Pasportization of Curves. Science and Transport Progress, (6(96), 53–64. https://doi.org/10.15802/stp2021/257933

Issue

Section

RAILROAD AND ROADWAY NETWORK