THE METHOD OF DETERMINING RATIONAL OPTIONS OF REDUCING THE OPERATING TIME

Authors

  • A. A. Bosov Dnipropetrovsk National University of Railway Transport named after Academician V. Lazaryan, Ukraine
  • B. P. Pikh Lviv Railway, Ukraine

DOI:

https://doi.org/10.15802/stp2004/20654

Keywords:

train running, reconstruction path, means of transport, vector optimization, expenses of funds

Abstract

Reduction of the running time of train on account of reconstruction of the track and the vehicles is considered as a problem of vector optimization. A technique of estimation of expenditures dependence on the saved running time of train has been proposed.

Author Biographies

A. A. Bosov, Dnipropetrovsk National University of Railway Transport named after Academician V. Lazaryan

A. A. Bosov

B. P. Pikh, Lviv Railway

B. P. Pikh

Published

2004-08-25

How to Cite

Bosov, A. A., & Pikh, B. P. (2004). THE METHOD OF DETERMINING RATIONAL OPTIONS OF REDUCING THE OPERATING TIME. Science and Transport Progress, (4), 96–102. https://doi.org/10.15802/stp2004/20654

Issue

Section

ECOLOGY AND INDUSTRIAL SAFETY