The calculation of safe time work of spans largest accumulated wear problems

Authors

  • I. H. Haniiev Jizzakh Polytechnic Institute, Uzbekistan, Uzbekistan

DOI:

https://doi.org/10.15802/stp2008/16292

Keywords:

safe time work, spans largest, accumulated wear problems

Abstract

Approximate formulae for the residual resource of spans in dependence on the wear accumulated are determined.

Author Biography

I. H. Haniiev, Jizzakh Polytechnic Institute, Uzbekistan

I. H. Haniiev

Published

2008-04-25

How to Cite

Haniiev, I. H. (2008). The calculation of safe time work of spans largest accumulated wear problems. Science and Transport Progress, (21), 105–106. https://doi.org/10.15802/stp2008/16292

Issue

Section

TRANSPORT CONSTRUCTION