Fink, V. K. and Kosenko, S. A. (2008) “THE INTERMEDIATE RAIL FASTENING CAT-5 IN KAZAKHSTAN”, Science and Transport Progress , (22), pp. 79–81. doi: 10.15802/stp2008/15493.