Gorbatiuk, Y. M., Kosiak, V. M., & Olefirenko, S. I. (2007). DESIGN OF BRIDGES FOR HIGH-SPEED HOVER IN EXTREME CONDITIONS. Science and Transport Progress, (16), 90–94. https://doi.org/10.15802/stp2007/17717