Kazaryan, V. Y. (2010). RECONSTRUCTION OF BRIDGE STRUCTURES USING DIAMOND DRILLING AND CUTTING TECHNOLOGY. Science and Transport Progress, (33), 102–105. https://doi.org/10.15802/stp2010/13165