Fink, V. K., & Kosenko, S. A. (2008). THE INTERMEDIATE RAIL FASTENING CAT-5 IN KAZAKHSTAN. Science and Transport Progress, (22), 79–81. https://doi.org/10.15802/stp2008/15493