[1]
Ostapenko, I.S. 2022. Features of the Implementation of technological Solutions of the Bridge Crossing Construction Project with a Temporary Bridge. Science and Transport Progress . 3-4(99-100) (Dec. 2022), 87–94. DOI:https://doi.org/10.15802/stp2022/275713.