[1]
Fink, V.K. and Kosenko, S.A. 2008. THE INTERMEDIATE RAIL FASTENING CAT-5 IN KAZAKHSTAN. Science and Transport Progress . 22 (Jun. 2008), 79–81. DOI:https://doi.org/10.15802/stp2008/15493.