[1]
Salamakhin, P.M. 2010. PROBLEMS ARE CAUSED TO CHANGE TYPICAL TEMPORARY LOADS AC FOR BRIDGES CONSTRUCTIONS. Science and Transport Progress . 33 (Aug. 2010), 232–239. DOI:https://doi.org/10.15802/stp2010/13321.